HIGH EFFICIENCY DRY CLAW PUMPS
TRIPLEX STACK MOUNTED VACUUM SYSTEMS
Furnish and
install, where shown on the drawings a prefabricated triplex stack
mounted high efficiency dry claw vacuum system model____________ as manufactured by EMSE Corporation, Fairfield, NJ (1-800-935-EMSE)
The unit furnished shall be a standard
catalog item of the supplier regularly engaged in the business of providing
packaged systems for hospitals and laboratories and shall meet and exceed the
requirements of NFPA 99.
The package
shall include three high efficiency dry claw vacuum pumps and associated
equipment, one ASME tank and one triplex control panel. The only field
connections required will be system intake, exhaust and power connection at the
control panel. All components shall be completely pre-piped and pre-wired to
single-point service connections. All interconnecting piping and wiring shall be
completed and operationally tested prior to shipment. Provide liquid tight
conduit, fittings and junction boxes for all control and power wiring.
The vacuum pumps
shall be of the continuous duty, high efficiency, oil-less and frictionless
compression claw type design, equipped with intake filters and exhaust mufflers,
driven by 3 phase, 60 cycle, NEMA C-Face motors.
The pumps shall not have wearable vanes and shall not require water for operation. The maintenance shall be limited to annual bearing greasing. Less energy and maintenance efficient systems will not be considered.
Each vacuum pump
shall be driven by a ____ HP, 3 phase, 60 cycle, ______ volt, 1750 RPM, TEFC
NEMA C-face motor. Each pump shall have a capacity of ____SCFM at 19 “HG.
The system shall include the following
accessories for each pump: inlet check valve, inlet isolation valve, vacuum
control switch, integral inlet filter, exhaust muffler and vacuum relief valve.
Provide flexible connectors on inlet and exhaust of each pump, exhaust tee with
union, drip-leg with cock valve as well as copper tubing with shut-off cock for
gauge and vacuum switches. The system shall include a _______ gallon vacuum
storage tank of ASME construction.
The tank shall be rated for full vacuum service and shall be equipped with a
valved by-pass, vacuum gauge and manual tank drain. The inside of the tank shall
be coated for rust protection with a two component coating which provides a
hard, durable lining.
Provide vibration mounting per NFPA 99.
The system shall include a UL listed control
panel in a NEMA 12 enclosure with the following accessories for each
pump:
Externally operable
Provide the panel with a plug-in type programmable controller with removable terminals to allow quick and easy replacement in the field. The system should be designed to function even if the programmable controller fails. If one of the pumps is out of service the system control shall omit the pump from the alternating cycle, automatically alternating between the remaining pumps only. The system shall revert to normal alternation automatically when the condition is corrected. In addition to standard automatic alternation, the system shall be equipped with forced time alternation in the event that the pump is unable to satisfy the demand in 30 minutes. The system shall be equipped with a flashing light pump failure alarm/shutdown at any of the following conditions: motor overload tripped, main disconnect is off, blown fuse, control transformer failure, starter coil failure, H-O-A is off.
Provide audible and visual local alarm (complete with indicating lights and individual sets of auxiliary contacts wired to the terminal strip for remote alarm indication) for the following: vacuum pump thermal malfunction and reserve vacuum pump in use. Provide manual reset for thermal malfunction shut-down. All control and alarm functions shall remain energized while any vacuum pump in the system remains electrically on-line. The lag vacuum pump shall be able to start automatically if the lead vacuum pump fails to operate.
The vacuum system shall be guaranteed in
writing by the manufacturer for a period of 12 months from the date of start-up
or 18 months from the date of shipment (whichever comes first) against defects
in design, materials, or construction.
The service of a factory trained
representative shall be made available at the jobsite to check installation,
start-up and instruct operating personnel in the proper operation and
maintenance.